Sign In | Join Free | My xpshou.com |
|
Brand Name : Trumony
Model Number : TR-T22007
Certification : CE,ISO,RoHS,UL
Place of Origin : China
MOQ : 1000kg
Price : Negotiation
Payment Terms : L/C, D/A, D/P, T/T
Supply Ability : 100000ton/Every Year
Delivery Time : 4~6wks with mold tooling time
Packaging Details : Export Standard Packing
Aluminum Alloy : 3003, 6061, 6063 etc.
Tolerance : ±3%
Shape of tube : Flat, Oval, Square
Width : As customer's drawing
Length : Per clients's drawing
Procedure : Extrusion, Welding, Cutting
Surface treatment : Mill finished, Zinc Spray etc.
Temper : O/H24
Used for : Evaporator, Radiator, Charge air cooler, Condenser, AC
Keywords : aluminum extruded tubing, extruded tube for car condenser, aluminum tube
Width 8~40mm Customized Zinc Spraying Aluminum Extruded Tubing
Trumony has over 16 years of experience in providing aluminum tube for condenser, evaporator, air cooler, and other heat exchangers. We have lots of mold tooling for your choice. In case of any special demand, qualified samples can be supplied after the customer providing the relevant drawings.
Chemical composition
Alloy | Si | Fe | Cu | Mn | Mg | Cr | Zn | V | Ti |
1050 | ≤0.25 | ≤0.40 | ≤0.05 | ≤0.05 | ≤0.05 | --- | ≤0.05 | ≤0.05 | ≤0.03 |
1100 | ≤0.95(Si+Fe) | 0.05~0.20 | ≤0.05 | -- | -- | ≤0.10 | --- | --- | |
3102 | ≤0.40 | ≤0.70 | ≤0.1 | 0.05~0.4 | --- | --- | ≤0.3 | --- | ≤0.10 |
It can be customized according to customers' request!
Mechanical Properties
Alloy | Temper | Tensile Strength | Yeild Strength | Elongation |
1050 | O/F/H111/H112 | ≥65MPa | ≥200MPa | ≥25% |
1100 | O/F/H111/H112 | ≥75MPa | ≥200MPa | ≥25% |
3102 | O/F/H111/H112 | ≥75MPa | ≥200MPa | ≥25% |
3003 | O/F/H111/H112 | ≥75MPa | ≥200MPa | ≥25% |
Items | Range |
Width | 8mm~40mm |
Thickness | 1mm~5mm |
Wall thickness | 0.15mm~0.8mm |
Thickness of zinc spraying | 6g/mm²~15g/mm² |
Fixed length | 200mm~4000mm |
Number of pores | 3~30 |
It can be customized according to customers' request!
FAQ:
Q: Are you a trading company or manufacturer?
A: Yes,we are a factory with more than 10 years history in this industry.
Q: What is your terms of payment ?
A: Normally 30% TT in advance, balance paid before shipment.
Q: How long does it take for samples and mass production?
A: Usually it will take 15-20 days for new molds and free samples (within 5 kg),;after confirmation, 25-30 days for mass production.
Q: OEM/ODM available?
A: Yes,we can!
Q: Could you provide sample?
A: Yes, We are honored to offer you samples for quality check.
Q: Is sample order accepted?
A: Yes,we accept sample order and we can provide design service!
![]() |
Zinc Spraying Aluminum Extruded Tubing Width 8 - 40mm Customized Images |